TechSkills of Future

Detailed Network and Server Rack Connection Diagram

Detailed Network and Server Rack Connection Diagram
OFFICE . LAB· N/W .SERVER. RACK DRAWING
RC-01
LAB-Test & Evaluation PAR — ASIA

Complete network design and Architecture with cabling diagrams, connection Skills, Verifications and step-by-step installation for the ATMS LAB Rack system including BTSP (ADV COM), IDFP, GMR/ASMR, dual-redundant LAN, and power infrastructure.

42U RACK SW11 LAN1 SW21 LAN2 SW41 BTSP-1 SW42 BTSP-2 SW43 IDFP-1 KVM SW BTSP-1 SERVER HP SERVER DL380G10 BTSP-2 SERVER IDFP-1 SERVER GMR/ASMR SW1 ASMR PP12 GMR/ASMR SW2 PDU1 / PDU2 HP 200-240V 16A UPS1 PB01 UPS2 PB02 ATMS LAN EXTERNAL LAB_PP11A SW11 (LAN1) SW21 (LAN2) BTSP-1 SERVER BTSP-2 SERVER IDFP-1 SERVER GMR/ASMR SW1 + SW2 EXTERNAL INTERFACES GND RAIL — 2.5mm² to Building Ground (16mm²)-EAR
Drawing Design — Equipment–001

Equipment Identification

All equipment Populated in the Rack-01 LAB with part numbers, Model , manufacturers, and function.

LAB Rack — Front View (U1–U42)
42 41 40 39 38 37 LAB_SW11 — Juniper EX3400-24T Ethernet 24-ports LAB LAN1 36 35 LAB_SW21 — juniper EX3400-24T Ethernet 24-ports LAB LAN2 34 33 LAB_PP11A — RJ45 Patch Panel (External Lines) 32 31 LAB_SW41 (BTSP-1) — Juniper EX3400-48T Ethernet 48-ports BTSP-1 30 29 LAB_SW42 (BTSP-2) — Juniper EX3400-48T Ethernet 48-ports BTSP-2 28 27 LAB_SW43 (IDFP-1) — Juniper EX3400-48T Ethernet 48-ports IDFP-1 26 25 24 LAB_KVM1 — HP AF634A (Console KVM+Monitor 18″) 23 LAB_KVM SW1 — HP AD569A (KVM Switch 16p) 22 LAB_BTSP-1 — HP SERVER DL380G10 ADV COM 1 Tower Surveillance Data Processing 21 20 LAB_BTSP-2 — HP SERVER DL380G10 ADV COM 2 Tower Surveillance Data Processing 19 18 17 LAB_IDFP-1 — HP SERVER DL380G10 MOVER Data Processing 16 15 14 13 12 SW1_ASMR_GMR1 — CISCO EX3400-24T (GMR & ASMR) 11 GMR_ASMR_PP12 — Patch Panel 48-ports GMR/ASMR 10 9 8 SW2_ASMR_GMR_CH2 — CISCO EX3400-24T GMR & ASMR System Channel 2 7 6 5 4 3 2 PDU1 (LINE 1) + PDU2 (LINE 2) — HP 200–240V 16A each — Dual Redundant Power 1 LEGEND N/W Switch HP Server GMR/ASMR Power PDU PP KVM
IDDescriptionReferenceManufacturerType
LAB_SW11Ethernet 24-ports LAB LAN1EX3400-24TJUNIPERSwitch
LAB_SW21Ethernet 24-ports LAB LAN2EX3400-24TJUNIPERSwitch
LAB_PP11ARJ45 Patch Panel – External Lines——Patch Panel
LAB_KVM1Rackmount Console KVM + Monitor 18″AF694AHPKVM
LAB_KVM SW1KVM Switch 16 portsAF652AHPKVM
LAB_SW41 (BTSP-1)Ethernet 48-ports BTSP-1EX3400-48TJUNIPERSwitch
LAB_SW42 (BTSP-2)Ethernet 48-ports BTSP-2EX3400-48TJUNIPERSwitch
LAB_SW43 (IDFP-1)Ethernet 48-ports IDFP-1EX3400-48TJUNIPERSwitch
LAB_BTSP-1BTSP W/ADV COM 1 – Ground Alerts, Ground Routing & GuidanceHP SERVER DL380G10HPServer
LAB_BTSP-2BTSP W/ADV COM 2 – Ground Alerts, Ground Routing & GuidanceHP SERVER DL380G10HPServer
LAB_IDFP-1IDFP – Flight Data ProcessingHP SERVER DL380G10HPServer
SW1_ASMR_GMR1Ethernet 24-ports GMR and ASMR SystemEX3400-24TCISCOGMR/ASMR
SW1_ASMR_GMR2Ethernet 24-ports GMR and ASMR SystemEX3400-24TCISCOGMR/ASMR
GMR_ASMR_PP12Ethernet 24-ports GMR/ASMR Patch Panel——Patch Panel
PDU1PDU 200-240V, 16A LINE 1—HPPower
PDU2PDU 200-240V, 16A LINE 2—HPPower
Network — ART -Data Flow–002

Core Network Architecture

Full dual-redundant network topology — LAN1 (green) and LAN2 (red) provide separate, independent paths for all critical ATMS traffic and Easley to maintenance .

LAB Rack — Complete Network Topology (Dual Redundant)
ATMS LAN EXTERNAL NETWORK LAB_PP11A RJ45 Patch Panel — External Lines Cat6A FTP LAB_SW11 LAN1 — CISCO EX3400-48T LAB_SW21 LAN2 — CISCO EX3400-48T LAN1 LAN2 LAB_SW41 BTSP-1 — EX3400-48T LAB_SW43 IDFP-1 — EX3400-48T LAB_SW42 BTSP-2 — EX3400-48T LAB_BTSP-1 HP SERVER HP SERVER DL380G10 ADV COM 1 LAB_IDFP-1 HP SERVER HP SERVER DL380G10 Flight Data Processing LAB_BTSP-2 HP SERVER HP SERVER DL380G10 ADV COM 2 ATS1101 ATS1103 ATS1105 EXL4100/4200/4300/4400/4500 External Interface Connections (Cat6A FTP) ─── LAN1 (Green) – – LAN2 (Red) ─── External

LAB LAN 1 (Green)

Primary network path. LAB_SW11 (EX3400-48T) connects PP11A → BTSP-1, BTSP-2, IDFP-1 servers via ATS0001, ATS0003, ATS1105 patch cord links. All cables: FTP Cat6A RJ45–RJ45.

LAB LAN 2 (Red)

Fully redundant secondary path. LAB_SW21 (EX3400-48T) mirrors LAN1, providing independent connectivity to all three servers to avoide any failure via ATS2001, ATS2003, ATS2005. Independent of LAN1 at every hop.

GMR/ASMR Network

Independent GMR/ASMR LAN via dedicated switches SW1 & SW2 and PP12 patch panel. LAN1 (green) and LAN2 (red) paths connect monitoring positions. EXL5001/6001 and EXL5002/6002 external links.

Power Cabling–003

Dual Redundant Power System

Each piece of equipment receives power from both PDU1 (LINE 1) and PDU2 (LINE 2) via IEC C14/C13 cables — ensuring no single power failure can interrupt service.

003-Power Cabling Diagram (UPS → PDU → Equipment)
UPS1 PB01 LINE 1 PDU1 200-240V 16A PWR1001→PS01 PWR1002→PS01 PWR1003→PS01 PWR1004→PS01 PWR1005→PS01 PWR1006→PS01 PWR1007→PS01 PWR1008→PS01 PWR1009→PS01 PWR1010→PS01 PWR1011→PS01 PWR1012→PS01 PWRN→PWR1000 LAB_SW11 LAB_SW21 LAB_KVM1 LAB_KVM SW1 SW41 (BTSP-1) SW42 (BTSP-2) SW43 (IDFP-1) LAB_BTSP-1 LAB_BTSP-2 LAB_IDFP-1 GMR/ASMR_SW1 GMR/ASMR_SW2 C14→C13 PDU2 LINE 2 (Redundant) PWR2001→PS02 PWR2002→PS02 PWR2003→PS02 PWR2004→PS02 PWR2005→PS02 PWR2006→PS02 PWR2007→PS02 PWR2008→PS02 PWR2009→PS02 PWR2010→PS02 PWRN→PWR2000 UPS2 PB02 LINE 2 All power cables: IEC C14 (PDU side) → IEC C13 (equipment PS01/PS02)
PDU1 → PS01 (Primary Line)
PDU2 → PS02 (Redundant Line)
DATA +GND — Cabling–004

External Interfaces & Grounding

External interface connections through BTSP/IDFP from other build or network switches and the complete rack grounding system.

Sheet 56 — External Interface Cabling (LAB Rack) · All cables: FTP Cat6A RJ45–RJ45
RC-01 LAB RACK — EXTERNAL INTERFACES (Sheet 56) SWITCHES (LEFT) EXTERNAL JUNCTION SERVERS (RIGHT) LAB_SW41 (BTSP-1) EX3400-48T SW BTSP-1 EXL 4100 EXL 4400 CH1 CH2 DUX-0001 EXL4100/4400 Junction LAB_BTSP-1 HP SERVER DL380G10 CH1 ← EXL4100 CH2 ← EXL4400 LAB_SW43 (IDFP-1) EX3400-48T SWITCH IDFP EXL 4300 CH2 DUX-0002 EXL4300 LAB_IDFP-1 HP SERVER DL380G10 CH2 ← EXL4300 (External interfaces of IDFP) LAB_SW42 (BTSP-2) EX3400-48T SW BTSP-2 EXL 4200 EXL 4500 CH1 CH2 DUX-0003 EXL4200/4500 Junction LAB_BTSP-2 HP SERVER DL380G10 CH1 ← EXL4200 CH2 ← EXL4500 COMMS RACK STRING M1 — EXTERNAL INTERFACES (Sheet 55) SW BTSP-1 LAB_SW41 SWITCH IDFP LAB_SW43 SW BTSP-2 LAB_SW42 → ATMS LAN1 → ATMS LAN2 CABLE LEGEND External Interfaces (FTP Cat6A RJ45–RJ45) Juniper CISCO EX3400-48T Switch HP SERVER DL380G10 (BTSP-1/2, IDFP-1) DUX Junction Box (intermediate patch) EXL4100/4200/4300/4400/4500 = External Interface Link cable IDs
Sheet 59 — Grounding System (GND Rail)
GND RAIL LAB_SW11 LAB_SW21 LAB_SW41 (BTSP-1) LAB_SW42 (BTSP-2) LAB_SW43 (IDFP-1) LAB_PP11A GMR/ASMR_SW11 GMR/ASMR_SW21 Rack Metal Structure BLDG GND 16mm² All equipment wires: 2.5mm² To building: 16mm²

Cable Schedule Summary

Cable IDTypeFromToColor / Purpose
PWR1001–1012IEC C14 / IEC C13PDU1 (LINE 1)Equipment PS01Power – Primary
PWR2001–2010IEC C14 / IEC C13PDU2 (LINE 2)Equipment PS02Power – Redundant
ATS1101/2101FTP Cat6A RJ45SW11/SW21BTSP-1 ServerLAN1 LAN2
ATS1103/2103FTP Cat6A RJ45SW11/SW21BTSP-2 ServerLAN1 LAN2
ATS1105/2105FTP Cat6A RJ45SW11/SW21IDFP-1 ServerLAN1 LAN2
EXL4100/4400FTP Cat6A RJ45SW41 (BTSP-1)BTSP-1 Ext CH1/CH2External
EXL4200/4500FTP Cat6A RJ45SW42 (BTSP-2)BTSP-2 Ext CH1/CH2External
EXL4300FTP Cat6A RJ45SW43 (IDFP-1)IDFP-1 Ext CH2External
EXL5001/6001FTP Cat6A RJ45PP12GMR/ASMR_SW1GMR/ASMR
EXL5002/6002FTP Cat6A RJ45PP12GMR/ASMR_SW2GMR/ASMR
GND all equip.Ground wire 2.5mm²GND RailEach equipment GNDGround
GND mainGround wire 16mm²GND RailBuilding GroundEarth Bond
Final after cabling –>Installation –05

Step-by-Step Installation

Follow this sequence for safe and correct rack build-up, cabling, and commissioning of the RC-01 LAB Rack.

1

Rack Preparation & Equipment Mounting

Mount rack in designated location with front and rear clearance ≥1m. Install rack rails at correct U positions per Sheet 51. Mount equipment starting from bottom up: PDUs first (U1–3), then GMR/ASMR (U7–12), IDFP (U16–17), servers (U19–22), KVM (U23–24), BTSP switches (U26–31), LAN switches (U34–37). Torque all rack screws to specification.

2

Grounding Before Any Power (Sheet-004)

Install GND grounding rail in rack. Connect 16mm² ground wire from rack GND rail to building grounding system first. Then connect all equipment with 2.5mm² ground wire from each unit’s GND terminal to the rail. Verify continuity with multimeter before proceeding. Equipment: SW11, SW21, SW41, SW42, SW43, PP11A, PP12A, GMR/ASMR SW11, GMR/ASMR SW21.

3

Power Cabling — PDU1 (Primary) (Sheet -003)

Connect UPS1/PB01 to PDU1 input (LINE 1). Route IEC C14 → IEC C13 cables from PDU1 outlets (PWR1001–PWR1012) to each equipment’s PS01 power supply port. Cable IDs: SW11 (PWR1001), SW21 (PWR1002), KVM1 (PWR1003), KVM SW1 (PWR1004), SW41 (PWR1005), SW42 (PWR1006), SW43 (PWR1007), BTSP-1 (PWR1008), BTSP-2 (PWR1009), IDFP-1 (PWR1010), GMR/ASMR SW1 (PWR1011), GMR/ASMR SW2 (PWR1012).

4

Power Cabling — PDU2 (Redundant) (Sheet –003)

Connect UPS2/PB02 to PDU2 input (LINE 2). Route IEC C14 → IEC C13 from PDU2 outlets (PWR2001–PWR2010) to each equipment’s PS02 (secondary PSU). This creates full power redundancy — each server and switch has two independent power paths from separate UPS systems. Label all cables with PWR IDs at both ends.

5

Patch Panel PP11A Installation (Sheets –001)

Mount LAB_PP11A at U32–33. Connect ATMS LAN external lines to rear of PP11A. Front ports connect to LAN1 and LAN2 via FTP Cat6A RJ45–RJ45 patch cords. Green patch cords = LAN1 side; Red = LAN2 side. Label each port with circuit IDs per sheet 53 port mapping. Verify external LAN1 Cyber External Interfaces are also terminated here.

6

LAN1 Cabling — Green Cables (Sheet –002)

Using green FTP Cat6A RJ45–RJ45: connect LAB_PP11A front ports → LAB_SW11 (LAN1) downlink ports. Then from SW11 uplink ports: patch cord IDs ATS1101 → BTSP-1 server, ATS1103 → BTSP-2 server, ATS1105 → IDFP-1 server. Also connect SW11 uplink to ATMS LAN1. Dress all green cables in left cable management tray.

7

LAN2 Cabling — Red Cables (Sheet –002)

Using red FTP Cat6A RJ45–RJ45: connect LAB_PP11A → LAB_SW21 (LAN2). Then SW21 → ATS2101 (BTSP-1), ATS2103 (BTSP-2), ATS2105 (IDFP-1). LAN2 cables are completely independent of LAN1 at every hop. Dress red cables in right cable management tray, kept physically separate from green cables throughout the rack.

8

External Interface Cabling (Sheets –004)

Connect external interface cables from BTSP/IDFP switches to server external ports: EXL4100/4400 (SW41→BTSP-1 CH1/CH2), EXL4200/4500 (SW42→BTSP-2 CH1/CH2), EXL4300 (SW43→IDFP-1 CH2). Route through DUX-0001/0002/0003 junction boxes. All cables: FTP Cat6A RJ45–RJ45. Label both ends with EXL cable IDs.

9

GMR/ASMR Cabling (Sheets –002)

Install GMR/ASMR_PP12 patch panel. Connect external ASMR & GMR interfaces: EXL5001/6001 → GMR/ASMR_SW1, EXL5002/6002 → GMR/ASMR_SW2. For monitoring positions: connect GMR/ASMR LAN1 (green) and LAN2 (red) from PP12 to both switches. Cybersecurity LAN1 and LAN2 interfaces connect per sheet 57 legend using separate patch cord colours (blue/yellow for Cybersecurity).

10

Power-On Sequence & Verification

Power-on order: (1) UPS1 → PDU1 energise, (2) UPS2 → PDU2 energise, (3) Network switches (SW11, SW21, SW41, SW42, SW43), (4) KVM system, (5) Servers (BTSP-1, BTSP-2, IDFP-1), (6) GMR/ASMR switches. Verify green LED on each CISCO switch. Check all server PS01 and PS02 LEDs are green. Verify GND continuity readings <1Ω.

Tips & Best Practices

🟢 Colour Discipline is Critical: Never mix green and red patch cords. Green cables are exclusively LAN1, red are exclusively LAN2. A wrong-colour cable in the wrong path is a single point of failure that defeats the entire redundancy design.
⚠️ Ground First, Power Second: Always complete all grounding connections (Sheet 59) before connecting any power cables. Failure to ground GMR/ASMR equipment can cause interference in radar signal chains and risk of equipment damage.
📋 Label Everything: Both ends of every cable must be labelled with the cable ID from the drawings (PWR1001, ATS1101, EXL4100, etc.). Use heat-shrink labels or cable label wraps. This is critical for fault-finding and future maintenance.
⚡ IEC C14 → C13 Polarity: Verify correct orientation of IEC power connectors before inserting — C14 (male, on cable) connects to PDU outlets; C13 (female, on cable) connects to equipment. Do not force connections.
🔵 Cable Management: All Cat6A cables must be dressed with minimum bend radius ≥25mm (8× cable diameter). Use Velcro straps — never zip ties on data cables. Keep power and data cables in separate cable management trays (minimum 50mm separation).
🔒 FTP Shielding Continuity: All network cables are FTP (Foiled Twisted Pair). Ensure RJ45 plugs have metal body and that cable shields are terminated correctly in plugs. Verify shield continuity with a cable tester before making connections permanent.
🔋 UPS Load Balance: PDU1 (UPS1) and PDU2 (UPS2) should carry approximately equal loads. With 12 outlets on PDU1 and 10 on PDU2, verify that total load on each UPS line stays within the 16A breaker rating (typically ≤80% = 12.8A per line).
📡 GMR/ASMR Isolation: The GMR/ASMR subsystem uses dedicated switches (SW1, SW2) and patch panel (PP12), separate from the main LAB LAN infrastructure. Do not cross-connect GMR/ASMR ports to LAB LAN ports without written authorisation from the system engineer.

✓ Final Verification Checklist

ATMS System Concepts–006

System Architecture Concepts

Understanding the purpose and function of each subsystem in the Navi Mumbai ATMS Test & Evaluation environment.

🗼

BTSP / ADV COM

Tower Surveillance Data Processing with Advanced Surface Movement Guidance & Control System. Processes radar data for Ground Alerts, Ground Routing, and Guidance. Two redundant BTSP servers (HP SERVER HP SERVER DL380G10) run ADV COM 1 & ADV COM 2 for high availability.

✈️

IDFP — Flight Data Processing

Processes flight plan data and correlates it with radar tracks. Provides flight data to controllers at Navi Mumbai. Connected via dedicated SW43 switch on its own BTSP switch segment for traffic isolation from ground surveillance systems.

📡

GMR / ASMR

Surface Movement Radar and Multilateration system. GMR provides radar coverage of the airport surface; ASMR tracks aircraft and vehicles using time-difference-of-arrival from multiple antennas. Operated on an isolated network via dedicated PP12 and SW1/SW2 switches.

🔁

Dual Redundant LAN

LAN1 (green, SW11) and LAN2 (red, SW21) provide independent network paths. In normal operation both are active; if one switch or cable fails, the other carries all traffic with zero service interruption. Critical for ATMS safety systems.

⚡

Dual UPS Power

UPS1/PDU1 and UPS2/PDU2 provide 2N power redundancy. Every equipment has two PSUs fed from independent UPS lines. Even a complete failure of one UPS, one PDU, or one power cable does not interrupt any equipment’s operation.

🖥️

KVM Console

HP AF644A KVM + 18″ monitor with AF652A 16-port KVM switch provides local out-of-band console access to all servers (BTSP-1, BTSP-2, IDFP-1) and switches. Essential for BIOS-level configuration and recovery without network access.

RC-01

LAB Test & Evaluation | Drawing No. 2026 | ASIA -LAB.

LAN1 Green LAN2 Red IEC C14/C13 Power GND 2.5mm²/16mm² Cat6A External GMR/ASMR

Leave a Comment